SMART WASTE was founded by Shikun Binui and Blogen with the goal of establishing Israel’s most advanced waste sorting and treatment facility, in accordance with the national goals of the Ministry of Environmental Protection. Our primary goal is to reduce the amount of waste sent to landfills and to recycle waste in Israel, leading an innovation revolution in municipal waste treatment through advanced green technologies.
We are leading the establishment of the first technological park of its kind in the country, in cooperation with the Ministry of Environmental Protection, for an operating period of 25 years as part of the national program of the State of Israel. The park is intended for recycling and treating municipal waste, its planning and operation are under the close supervision of the Ministry, and it meets European regulatory standards and the most stringent standards.
Our park brings about environmental, economic, and social change through the following goals:
At SMART WASTE’s recycling technology park, we use the most advanced technologies to turn municipal waste into a valuable resource.
Our park sorts and treats household waste automatically and accurately, we turn the nuisance into a resource and recycle waste into green energy: green electricity and biogas, and change the face of recycling in Israel. All processes are carried out without pollutant emissions and to the most stringent standards.
In addition, the park reduces the scope of waste landfilling, reduces traffic, odor, and noise nuisances, and prevents pirate activity by unprofessional companies. The huge investment in the park strengthens the local economy and offers a long-term solution to the strategic problem of municipal waste treatment in Israel.
Today, household waste in Israel is collected by compactors (green trucks) and transported to intermediate sites (transfer stations), where it is piled up in large heaps and then mostly loaded onto trucks and sent to landfills in the land of Israel, mainly in the Negev area. This is an irreversible process that includes three main disadvantages:
Transporting large quantities of waste on Israel’s roads, which increases traffic congestion and air pollution.
Recycling waste on a small scale, which causes waste of resources.
Polluting our country’s soil in a way that harms us and future generations.
Global warming as a result of methane gas decomposition in the process.
Landfilling waste is the least preferred treatment method in the waste treatment hierarchy worldwide due to its high environmental cost. Nevertheless, Israel currently landfills over 80% of the waste. SMART WASTE’s park is designed to change this reality and reduce landfill percentages.
The main goals of the State of Israel’s strategic plan for waste treatment until 2030 are:
In accordance with the policy of the Government of Israel and the Ministry of Environmental Protection, the park to be established by SMART WASTE will replace existing and old transfer stations in the Rishon LeZion area and its surroundings and will be the most advanced park in Israel for the separation and recycling of household waste. The park not only reduces the scope of landfilling, but also generates electricity and recycling products on the largest scale, thereby contributing to improving environmental quality and sustainability for future generations.
Smart Waste, a collaboration between Blogen and Shikun Binui, won the tender from the Ministry of Finance and Environmental Protection to establish and operate the park for 24 years and 11 months. At the end of this period, the park will return to the state. Here are some important points regarding the experience and technologies implemented in it:
This commitment to experience, technology, and compliance with stringent standards ensures that the park will function optimally and meet all the requirements and expectations defined in the project.
Our park meets the most stringent standards of the Ministry of Environmental Protection, including:
Systems will be installed in the park to prevent the emission of pollutants, a risk survey was conducted according to the definitions of the Ministry of Environmental Protection in various scenarios. The survey findings indicated that there is no risk to residential homes, businesses, and other factors. After the establishment of the park, a comprehensive odor survey with odor measurements will be conducted, and the survey will be published to the public.
The construction of our park is actually intended to alleviate the problem of congestion and not to exacerbate it. Here are some ways we plan to achieve this:
These measures are intended not only to prevent the exacerbation of traffic jams but also to improve the existing situation, while maintaining safety and efficiency of traffic in the affected areas.
These claims are far from reality. First, we will mention that the Ministry of Environmental Protection intends to stipulate in the regulations that only compost created from waste separated at the source can be used as compost for agriculture. As these regulations pass, the compost produced at the facility will be able to be used for agriculture if the authorities in the vicinity of the facility move to separate waste at the source.
Already now, after the biogas is processed, the remaining organic material undergoes an advanced technological process and is transferred to closed cells where it is stabilized so that it does not affect the environment. This process is actually composting, which, as the organic material is separated at the source, can be used in the future as high-quality compost.
Here are some important points about our production process:
If you are concerned about the quality of our compost, rest assured that we are making every effort to ensure that it is safe, clean, and of high quality for agricultural and other uses. All within the framework of our commitment to protecting the environment and turning waste into a valuable resource.
There is no concern about soil or groundwater contamination as a result of our park’s activity. We take stringent measures to ensure environmental safety, including:
These measures ensure that the leachate will not seep into the groundwater and will not endanger water sources. Protecting the environment is our top priority, and we operate in accordance with the highest standards to ensure this.
We understand the concern, but it is based on incorrect information. All processes in our park are carried out in closed structures that do not allow the emission of air or odor outside. Here are some important points on how we ensure that the air in the environment remains clean and safe:
Residents of the area can rest assured that the air they breathe will not be adversely affected by our activity. We are here to protect the environment and public health, all while promoting advanced technological solutions for waste treatment.
First of all, it is important to understand the whole picture. As of today, the amount of waste landfilled in Israel is increasing every year, and this is in contrast to developed countries that manage to reduce landfill volumes. This is where we come into the picture: our park treats 100% (!!) of the waste that reaches it, and not only that. Our goal is to reduce the scope of landfilling to 40%. This is not only a significant step, but also part of the overall solution to the national and regional problem of waste treatment. Moreover, as the separation at the source of household waste increases in the future, it will be possible to reduce landfill rates even to lower numbers.
And regarding the policy of the Ministry of Environmental Protection? We are completely in the right direction. Our park, combined with similar facilities that will be built in the future, will help the country solve the waste problem in Israel and meet the goals it has set. We see ourselves as part of the solution and not as part of the problem, and we will continue to act to lead this green revolution.
We are happy to reassure you – there are no fires and no pollution with us! Our project does not include a thermal process or burning of waste of any kind. The park is planned to operate in a natural method of anaerobic digestion, which means treating waste without burning and without emitting combustion products. All processes are carried out inside closed structures, so there is no emission of air or odors outside. We will use generators to produce green and clean electricity from biogas produced from the waste.
In addition, we will take care to install advanced systems that will prevent the emission of pollutants from the park. Thus, you can be sure that the air will remain clean and healthy, and your health is in good hands. SMART WASTE is committed to protecting the environment and public health, and we will continue to act responsibly and professionally for the benefit of us all.
Green electricity is one of our green achievements! In the process of treating organic waste, biogas is created – a natural gas that is extracted from organic waste. We convert this biogas into electrical energy with a capacity of 5 megawatts. The electricity will be generated by a generator. But that’s not all! We will install a solar system on the roofs of the site with an area of about 30 dunams, which will provide additional energy. Thus, we not only treat waste efficiently, but also produce clean and green energy.
Our park is ready to treat all types of household waste, whether it has been separated at the source or not. Our park, Smart Waste, is a highly advanced sorting park, which will allow maximum extraction of materials for recycling. In addition, it will treat the organic stream of waste using anaerobic digestion, unlike other sorting facilities that do not treat this stream.
The process includes the production of biogas from organic waste, which is converted into green electricity. After the biogas is processed, the remaining organic material undergoes an advanced technological process and is transferred to closed cells where it is stabilized so that it does not affect the environment. This process is actually composting, which, as the organic material is separated at the source, can be used in the future as high-quality compost.
In short, we provide a comprehensive and green solution for all types of household waste, with an emphasis on efficiency and environmental protection.
In summary, the expected truck traffic will not lead to additional nuisances in the residential neighborhoods, and no additional air pollution is expected as a result.
The park’s design ensures optimal prevention of odors and air pollution, and the strict treatment systems ensure that no odors will be released from the park to the nearby environment:
Our park is not just a waste treatment park – it is the ultimate solution for protecting the environment. The park will treat all waste that arrives, separate and sort the waste, and recycle everything that can be reused. This means that the volume of waste destined for landfill will be reduced by about 50%, and instead, materials for recycling such as paper, plastic, metals, green energy – biogas and green electricity will be produced from it.
After the biogas is processed, the remaining organic material undergoes an advanced technological process and is transferred to closed cells where it is stabilized so that it does not affect the environment. This process is actually composting, so the more organic material is separated at the source, the more it can be used in the future as a high-quality compost.
In addition, we meet the most stringent standards and create a closed working environment to prevent unpleasant odors. In short, we not only solve the waste problem, but also produce vital resources and reduce the negative impact on the environment.
Noise? Not in our school! All our waste treatment systems are located inside closed and soundproofed buildings, so the noise generated in the park will not affect the external environment. We have carried out a rigorous noise prediction that proved that there will be no deviation from the strict criteria set by law, and the issue was approved by the Ministry of Environmental Protection. To be one hundred percent sure, we will carry out noise measurements during the trial and operation of the park, in order to ensure that everything is running according to the accepted standards. So you can rest assured and enjoy industrial peace.
No need to worry, our park does not store fuels in dangerous quantities. The amount of biogas that will be stored in the park is small and intended for internal use only. We take care of safety at the highest level with strict protection measures according to the Home Front Command requirements. In addition, we have carried out rigorous risk assessments, and examined possible scenarios of loss of contents or damage to the biogas tank. Even in the most extreme case, no impact on the nearby settlements is expected. So you can sleep peacefully, we are here to keep you safe.
It is important for us to preserve natural values and the environment. The park is located next to the existing Shafdan Park, and the entire project is carried out in cooperation with the Nature and Parks Authority and with the guidance of ecological consultants. As part of the environmental impact assessment, all the environmental components on the site were examined, and no geophytes (plants with bulbs) that require relocation were found. Before starting work in the field, we will ensure that the animals can move to the nearby open areas according to the instructions of the Nature and Parks Authority and in coordination with them. Even after the park starts operating, we will implement measures to prevent harm to animals and preserve their natural habitat, so that animals can also enjoy a safe and pleasant environment.
Stay Updated on the Clean-Tech Transformation